Effective drainage takes us half way to the finish line
According to ancient wisdom, rapid drainage is vital. What this knowledge means with regard to the new studio is that our workmen will have a very perceptible feel of this: after all, according to the construction plan, they have only one week to install several hundred metres of drainage troughs. To ensure better rainwater drainage, hollows will first be dug to sink the metal sections and drain pipes.
At the same time, the fitters are in the process of constructing a solid ceiling, also to be completed this week. In other words, the triumphant promotion to the second studio floor will soon be home and dry.
Newly developed: the latest photos
Kommentar schreiben